Compare an announced habitat project with what is documented later

Put a promise beside the evidence that followed it, and see which steps can actually be shown.

Learning contentAges 12 and up, in a classroom or a discussion group30 minute read

The activity, step by step

What you need

  • One habitat project from the examples below, or any project page
  • A page split into three columns: announced, documented, missing
  • The project's source list
  1. Step 01

    Write the announcement as a quotation

    Copy what was promised, the date it was said and who said it. Keep the original wording rather than summarising it.

  2. Step 02

    List the steps in order

    Announcement, planning, permit or funding, construction, completion, opening, animal access, documented animal use. Write each one on your page.

  3. Step 03

    Mark each step confirmed, unverified or not documented

    Use only what the record and its sources show. A step with no public document is "not documented", not "did not happen".

  4. Step 04

    Compare the dates

    Put the announcement date next to the date of the most recent evidence. Note any target date that has passed, and say whether a delay is documented or simply unrecorded.

  5. Step 05

    Separate the building from the animal

    Check whether any public document shows an animal using the habitat. If the record does not show it, say so plainly rather than assuming either way.

  6. Step 06

    Write two sentences, no more

    One sentence on what the public record shows, and one on what it does not. If a sentence needs a conclusion you cannot source, cut it.

Starting points from the published records

These are read live from the records published on this site, so the list changes as new records are added. Each one links to its own page, where every line can be traced to a source.

  • dated events on the record.

  • dated events on the record.

  • dated events on the record.

Questions to talk through

These are prompts, not a test. There is no answer key, and more than one of them can be answered with "the record does not say".

  1. Which step of this project is best documented, and by what kind of source?
  2. Is the gap in the record about construction, about opening, or about the animal?
  3. How would your answer change if one document appeared tomorrow?
  4. Why might a project be reported as finished when the record shows otherwise?

Learning content

These pages are background reading and activities, not a formal school curriculum. There is no course, grade level, standards alignment, assessment or qualification here, and no account is needed.

If a guide or an activity misstates something on a record, send the public document that settles it through the reader desk. How sources, labels and corrections are handled is set out in the reporting methodology.

Share this learning page